Located in the Western Province of Papua New Guinea, Ok Tedi Mine is the longest running open-pit copper, gold and silver mine in Papua New Guinea. Ore is mined and processed at an onsite flotation processing plant capable of treating up to 24 million tonnes per annum (Mtpa). The plant currently recovers copper, gold and
Lihir Island is located on a geothermally active extinct volcanic crater in the New Ireland Province of Papua New Guinea and is one of the world’s largest producing gold mines. The processing plant consisting of crushing, grinding, flotation, pressure oxidation and NCA circuit. Our Partnership International Mill Relines has serviced the Lihir project since 2020 with
Located in Northern Sumatra the mine produces more than 300,000 oz of Gold and 2-3 million oz of Silver annually. The plant consists of a crushing & stockpile ore reclaim area, grinding & classification, leaching (CIL) & absorption, carbon desorption & regeneration, cyanide detoxification, tailings storage facility and a clean water polishing plant. Our Partnership
Located on the Northern tip of Masbate Island (Philippines) this remote mine site has a process plant that is a conventional carbon-in-leach (CIL) facility consisting of primary crushing, SAG/Ball Mill grinding circuit with pebble crushing, leaching, absorption, elution, electrowinning and smelting gold recovery stages; and a cyanide detoxification stage for treating process plant tails before
Located in one of Australia’s harshest and most remote deserts, the mine site has an astronomical annual gold production of 459,000 attributable ounces and can process 2.5 million tonnes of ore a year. The treatment plant consists of a crushing and grinding facility and a carbon-in- pulp (CIP) circuit. Our Partnership IMR provides the Granites
Located in the north west of Vietnam in rough terrain jungle, the Nui Phao project is a polymetallic deposit, with an initial Ore Reserve of 53Mt. The site has been defined to contain; tungsten, fluorite, bismuth and copper mineralisation. Our Partnership Mine production is designed to produce 3.5 Mtpa of ore for a multi-stream processing
Unit 3/6-7 Plath Cl, Portsmith QLD 4870
Postal: PO Box 836, Bungalow QLD 4870
Phone: +617 4053 3004
Fax: +617 3054 7240
Email: info@imrelines.com