Call us: +617 4053 3004
admin@imrelines.com
  • News
  • Careers
  • Contact
  • Login
IMR GroupIMR GroupIMR GroupIMR Group
  • Home
  • Our services
    • What we do

      International Mill Relines - What we do

    • Services

      • What we do
      • Mill relines
      • Liner Installations
      • Scheduled and shutdown maintenance
      • Backing rubber installations and repair
      • Labour hire
    • Innovation

      • Innovation
      • Engineering
      • Consultation and planning
      • Reline tooling
  • Procurement
  • Our projects
    • Nui Phao Case Study

    • Projects

      • Lihir (Papua New Guinea)
      • The Granites (Australia)
      • Nui Phao (Vietnam)
      • Masbate Gold Project (Philippines)
      • Martabe (Indonesia)
    • Success

      • Case Study: Masbate, Philippines
      • Case Study: Nui Phao
      • Testimonials
      • Awards
  • Our company
    • “Whether you are big or small, you cannot give good customer service if your employees don’t feel good about coming to work.”
    • About IMR GROUP

      • About us
      • Awards
      • Contact Us
    • Careers

      • Apply
      • Induction

Projects

Ok Tedi, Papua New Guinea

View more

Ok Tedi, Papua New Guinea

Ok Tedi, Papua New Guinea

Ok Tedi, Papua New Guinea

November 15, 2023
9

Located in the Western Province of Papua New Guinea, Ok Tedi Mine is the longest running open-pit copper, gold and silver mine in Papua New Guinea. Ore is mined and processed at an onsite flotation processing plant capable of treating up to 24 million tonnes per annum (Mtpa). The plant currently recovers copper, gold and

View More
Ok Tedi, Papua New Guinea
2023-11-15

Lihir, Papua New Guinea

View more

Lihir, Papua New Guinea

Lihir, Papua New Guinea

Lihir, Papua New Guinea

September 30, 2020
11

Lihir Island is located on a geothermally active extinct volcanic crater in the New Ireland Province of Papua New Guinea and is one of the world’s largest producing gold mines. The processing plant consisting of crushing, grinding, flotation, pressure oxidation and NCA circuit. Our Partnership International Mill Relines has serviced the Lihir project since 2020 with

View More
Lihir, Papua New Guinea
2020-09-30

Martabe, Indonesia

View more

Martabe, Indonesia

Martabe, Indonesia

Martabe, Indonesia

November 9, 2017
26

Located in Northern Sumatra the mine produces more than 300,000 oz of Gold and 2-3 million oz of Silver annually. The plant consists of a crushing & stockpile ore reclaim area, grinding & classification, leaching (CIL) & absorption, carbon desorption & regeneration, cyanide detoxification, tailings storage facility and a clean water polishing plant. Our Partnership

View More
Martabe, Indonesia
2017-11-09

Masbate Gold, Philippines

View more

Masbate Gold, Philippines

Masbate Gold, Philippines

Masbate Gold, Philippines

November 8, 2017
25

Located on the Northern tip of Masbate Island (Philippines) this remote mine site has a process plant that is a conventional carbon-in-leach (CIL) facility consisting of primary crushing, SAG/Ball Mill grinding circuit with pebble crushing, leaching, absorption, elution, electrowinning and smelting gold recovery stages; and a cyanide detoxification stage for treating process plant tails before

View More
Masbate Gold, Philippines
2017-11-08

The Granites, Australia

View more

The Granites, Australia

The Granites, Australia

The Granites, Australia

June 11, 2016
25

Located in one of Australia’s harshest and most remote deserts, the mine site has an astronomical annual gold production of 459,000 attributable ounces and can process 2.5 million tonnes of ore a year. The treatment plant consists of a crushing and grinding facility and a carbon-in- pulp (CIP) circuit. Our Partnership IMR provides the Granites

View More
The Granites, Australia
2016-06-11

Nui Phao, Vietnam

View more

Nui Phao, Vietnam

Nui Phao, Vietnam

Nui Phao, Vietnam

December 15, 2015
25

Located in the north west of Vietnam in rough terrain jungle, the Nui Phao project is a polymetallic deposit, with an initial Ore Reserve of 53Mt. The site has been defined to contain; tungsten, fluorite, bismuth and copper mineralisation. Our Partnership Mine production is designed to produce 3.5 Mtpa of ore for a multi-stream processing

Launch ProjectView More
Nui Phao, Vietnam
2015-12-15

Services

  • What we do
  • Mill relines
  • Liner Installations
  • Labour hire
  • Backing rubber installations and repair
  • Scheduled and shutdown maintenance

About IMR GROUP

  • About us
  • Awards
  • Contact Us
  • Apply
  • Induction

International Mill Relines

Unit 3/6-7 Plath Cl,
Portsmith QLD 4870

Phone: +617 4053 3004
Email: admin@imrelines.com

© IMR | Privacy Policy | Disclaimer
  • Home
    • Copyright notice
    • Disclaimer
  • News
  • Procurement
  • Projects
    • Case study: Modification and refurbishment of 4 axis liner handler
    • Case study: Simultaneous Reline
  • What we do
    • Backing rubber installations and repair
    • Labour Hire
    • Liner Installations
    • Mill Relines
    • Reline tools
    • Scheduled and shutdown maintenance
  • Courses
  • Terms & Conditions
  • Account
  • Innovation
    • Consultation & Planning
    • Engineering
  • About us
    • Apply
      • Online job application
    • Awards
    • Careers
    • Contact us
    • My account
    • Success
    • Testimonials
IMR Group